|
MOQ: | 1 Set |
Price: | Negotiable |
Standard Packaging: | Wooden case without need of fumigation |
Delivery Period: | 7days-35days |
Payment Method: | TT,LC |
Supply Capacity: | 25 sets per month |
Precision OEM metal shell custom computer case PC Case progressive bending die stamping
parts
Pierce & Cut Die Stamping is a very cost-effective way to quickly stamp flat, “rectangular” shaped parts such as shims, spacers, and plates. A benefit of Pierce & Cut Die Stamping is that raw material is better utilized reducing the total amount of scrap material produced over other stamping methods.
Parts are produced when the feed system pushes (strip or coil stock) of raw material into the Pierce & Cut Die; at each stroke or cycle a finished flat part will be cut off the end of the strip. This type of die requires that the raw material width is cut to the size needed for the part. The feed rate of the material is determined by the length of the part. Longer parts need more time per stroke to get the strip in position for the next stroke. Thickness also influences that feed rate. Thicker parts need the press to run a bit slower than thinner parts. Pierce & Cut Dies punch out holes and notches on the first stroke, and then the second and final stroke is the cut-off, where the completed part is cut from the strip. Once cut from the strip finished parts will be exit the die and will fall onto a chute or slider where they flow into the collection bin. The scrap is typically punched through the die and is collected under the press, or next to the press using chutes or slides.
METS can design and build “bending and forming” tools, usually considered a secondary operation where a flat blank or part is placed into the tool and formed and bent with one or more operation or single press cycle, Usually lower volume parts will be formed and produced from secondary bending and forming tools.
Bend/Form Dies are used to bend, form, or draw the material or part into a variety of angles and shapes. This can be done as a secondary tool and operation, or it can be built into a progressive die.
Tool&Die Profile
General Capabilities | Design Modeling 2D, 3D,processing,assembling | Die Location Technical Support | Inspection |
Detail Tooling Documentation | DFMEA/PFMEA | Quick Building Prototypes | |
Die Types | Forming Dies | Precision Progressive Stamping Dies | Secondary Dies |
High Speed Steel Stamping Dies | Precision Blanking Dies | Forming Die | |
Tooling Material | Carbide(CD650,V3,KD20) | ASP-23 | ASP-60 |
S55C---45#55 | AL7075 | SKD11 | |
Tooling Life | 50 Million to 1000 Million Times | ||
Die Concept | 2-Plate Die | 3-Plate Die | Module Die |
Production Equipment | CNC | SODICK Nice Surface EDM | P/G |
Drill | SODICK Wire Cutting Machine | J/G | |
Milling Machine | WAIDA Profile Grinder Machine | ||
Stamping Equipment | AIDA | PURDER | MICO |
MICO | |||
Stamping Product | Custom Stamping | SIM shrapnel | Spring clip |
Battery shrapnel | Shield Drawing | Press-Fit Terminal | |
Lead Frame | Power Contact Terminal | PC Terminal parts | |
Additional Services Provided | Custom Packing | Packaging | Heat Treat |
Plating | |||
Delivery | 3-5 Week | 3-6 Week | 4-7 Week |
Mould building process
Step | Item | high speed stamping die |
1 | Quotation | Quote competitive price according to your details (drawing or sample, and related requirements). |
2 | Order | Sign agreement after confirming price |
3 | Mould design | Design the mould structure drawing according to your product drawing or sample, |
then send the tooling drawings to you for confirmation. | ||
4 | Mould making | After your confirmation of our drawing, we begin to make the moulds, |
during manufacturing program, | ||
we send you mould building progress with pictures every week, for you to know our process. | ||
5 | First trial | We will make the stamping die first trial on time, then send you video or picture |
and trial samples for you to confirm. | ||
Or you can also come to our factory .And we will inspect them and issue the report. | ||
6 | Quality confirm | You will confirm our stamping die quality according to sample. |
If you need to adjust the product structure, we can help you to change it further. | ||
7 | Delivery | Ship the stamping die after it is completely OK, packed by wooden case. |
FAQ
Q: What’s your manufacture capability?
---- We use Sodick/Charmilles to frabricate die inserts,dimension we can do is +/-0.002mm.
Q: Can you make all the dimensions are according to our design/samples?
---- We can guarantee that all the dimensions are made according to your drawing/sample.Please notice that dimension tolerence we can do is +/-0.003mm.
Q: Did the stamping die suit for my press machine?
--- The stamping die is made according to your press machine’s specification.Before start making die parts,we will send the design for your approval.
Q: What’s your advantage compare with other supplier’s on the market?
---- We are stamping factory,have a team contains die design,making,maintance and stamping production.We know how important the good mold for stamping production.
---- All our engineers are with more than 10 years working experience.They are more professional on precision stamping field.
---- All the die parts we made are by Slow-speed wire EDM,can gurantee the dimension.Many of them make it by middle-speed wire EDM/fast-speed wire EDM
Stamping die details:
|
MOQ: | 1 Set |
Price: | Negotiable |
Standard Packaging: | Wooden case without need of fumigation |
Delivery Period: | 7days-35days |
Payment Method: | TT,LC |
Supply Capacity: | 25 sets per month |
Precision OEM metal shell custom computer case PC Case progressive bending die stamping
parts
Pierce & Cut Die Stamping is a very cost-effective way to quickly stamp flat, “rectangular” shaped parts such as shims, spacers, and plates. A benefit of Pierce & Cut Die Stamping is that raw material is better utilized reducing the total amount of scrap material produced over other stamping methods.
Parts are produced when the feed system pushes (strip or coil stock) of raw material into the Pierce & Cut Die; at each stroke or cycle a finished flat part will be cut off the end of the strip. This type of die requires that the raw material width is cut to the size needed for the part. The feed rate of the material is determined by the length of the part. Longer parts need more time per stroke to get the strip in position for the next stroke. Thickness also influences that feed rate. Thicker parts need the press to run a bit slower than thinner parts. Pierce & Cut Dies punch out holes and notches on the first stroke, and then the second and final stroke is the cut-off, where the completed part is cut from the strip. Once cut from the strip finished parts will be exit the die and will fall onto a chute or slider where they flow into the collection bin. The scrap is typically punched through the die and is collected under the press, or next to the press using chutes or slides.
METS can design and build “bending and forming” tools, usually considered a secondary operation where a flat blank or part is placed into the tool and formed and bent with one or more operation or single press cycle, Usually lower volume parts will be formed and produced from secondary bending and forming tools.
Bend/Form Dies are used to bend, form, or draw the material or part into a variety of angles and shapes. This can be done as a secondary tool and operation, or it can be built into a progressive die.
Tool&Die Profile
General Capabilities | Design Modeling 2D, 3D,processing,assembling | Die Location Technical Support | Inspection |
Detail Tooling Documentation | DFMEA/PFMEA | Quick Building Prototypes | |
Die Types | Forming Dies | Precision Progressive Stamping Dies | Secondary Dies |
High Speed Steel Stamping Dies | Precision Blanking Dies | Forming Die | |
Tooling Material | Carbide(CD650,V3,KD20) | ASP-23 | ASP-60 |
S55C---45#55 | AL7075 | SKD11 | |
Tooling Life | 50 Million to 1000 Million Times | ||
Die Concept | 2-Plate Die | 3-Plate Die | Module Die |
Production Equipment | CNC | SODICK Nice Surface EDM | P/G |
Drill | SODICK Wire Cutting Machine | J/G | |
Milling Machine | WAIDA Profile Grinder Machine | ||
Stamping Equipment | AIDA | PURDER | MICO |
MICO | |||
Stamping Product | Custom Stamping | SIM shrapnel | Spring clip |
Battery shrapnel | Shield Drawing | Press-Fit Terminal | |
Lead Frame | Power Contact Terminal | PC Terminal parts | |
Additional Services Provided | Custom Packing | Packaging | Heat Treat |
Plating | |||
Delivery | 3-5 Week | 3-6 Week | 4-7 Week |
Mould building process
Step | Item | high speed stamping die |
1 | Quotation | Quote competitive price according to your details (drawing or sample, and related requirements). |
2 | Order | Sign agreement after confirming price |
3 | Mould design | Design the mould structure drawing according to your product drawing or sample, |
then send the tooling drawings to you for confirmation. | ||
4 | Mould making | After your confirmation of our drawing, we begin to make the moulds, |
during manufacturing program, | ||
we send you mould building progress with pictures every week, for you to know our process. | ||
5 | First trial | We will make the stamping die first trial on time, then send you video or picture |
and trial samples for you to confirm. | ||
Or you can also come to our factory .And we will inspect them and issue the report. | ||
6 | Quality confirm | You will confirm our stamping die quality according to sample. |
If you need to adjust the product structure, we can help you to change it further. | ||
7 | Delivery | Ship the stamping die after it is completely OK, packed by wooden case. |
FAQ
Q: What’s your manufacture capability?
---- We use Sodick/Charmilles to frabricate die inserts,dimension we can do is +/-0.002mm.
Q: Can you make all the dimensions are according to our design/samples?
---- We can guarantee that all the dimensions are made according to your drawing/sample.Please notice that dimension tolerence we can do is +/-0.003mm.
Q: Did the stamping die suit for my press machine?
--- The stamping die is made according to your press machine’s specification.Before start making die parts,we will send the design for your approval.
Q: What’s your advantage compare with other supplier’s on the market?
---- We are stamping factory,have a team contains die design,making,maintance and stamping production.We know how important the good mold for stamping production.
---- All our engineers are with more than 10 years working experience.They are more professional on precision stamping field.
---- All the die parts we made are by Slow-speed wire EDM,can gurantee the dimension.Many of them make it by middle-speed wire EDM/fast-speed wire EDM
Stamping die details: