| MOQ: | 10000pcs |
| Standard Packaging: | Wooden crate packaging, moisture and shock resistant, each mold set packed separately |
| Delivery Period: | 25-35 work days |
| Parameter | Specification |
|---|---|
| Product Name | Brass Stamping Parts for Switches |
| Material | Brass / Copper Alloy |
| Common Brass Grades | C26000 / C26800 / C28000 / H62 / H65 |
| Thickness | 0.1-3.0 mm, Customized |
| Manufacturing Process | Progressive Stamping / Compound Stamping / Punching / Bending / Forming |
| Die Type | Progressive Die / Compound Die / Single-Hit Die |
| Tolerance | ±0.01-±0.10 mm, Depending on Design |
| Surface Finish | Natural Brass / Tin / Nickel / Silver / Gold Plating |
| Corrosion Protection | Natural Brass / Anti-Oxidation / Plating |
| Hardness | Soft / Half Hard / Full Hard / Customized |
| Shape | Flat / L-Shaped / U-Shaped / 3D Formed / Customized |
| Contact Type | Switch Contact / Contact Plate / Terminal / Spring Contact |
| Production Volume | Prototype / Small Batch / Mass Production |
| Inspection | Dimensional / Optical / Visual / First Article Inspection |
| Packaging | Bulk / Tray / Tape & Reel / Carton / Wooden Case |
| OEM / ODM | Available |
| MOQ | Customized According to Project |
| Lead Time | Typically 7-35 Days, Depending on Tooling and Order Complexity |
| MOQ: | 10000pcs |
| Standard Packaging: | Wooden crate packaging, moisture and shock resistant, each mold set packed separately |
| Delivery Period: | 25-35 work days |
| Parameter | Specification |
|---|---|
| Product Name | Brass Stamping Parts for Switches |
| Material | Brass / Copper Alloy |
| Common Brass Grades | C26000 / C26800 / C28000 / H62 / H65 |
| Thickness | 0.1-3.0 mm, Customized |
| Manufacturing Process | Progressive Stamping / Compound Stamping / Punching / Bending / Forming |
| Die Type | Progressive Die / Compound Die / Single-Hit Die |
| Tolerance | ±0.01-±0.10 mm, Depending on Design |
| Surface Finish | Natural Brass / Tin / Nickel / Silver / Gold Plating |
| Corrosion Protection | Natural Brass / Anti-Oxidation / Plating |
| Hardness | Soft / Half Hard / Full Hard / Customized |
| Shape | Flat / L-Shaped / U-Shaped / 3D Formed / Customized |
| Contact Type | Switch Contact / Contact Plate / Terminal / Spring Contact |
| Production Volume | Prototype / Small Batch / Mass Production |
| Inspection | Dimensional / Optical / Visual / First Article Inspection |
| Packaging | Bulk / Tray / Tape & Reel / Carton / Wooden Case |
| OEM / ODM | Available |
| MOQ | Customized According to Project |
| Lead Time | Typically 7-35 Days, Depending on Tooling and Order Complexity |