|
MOQ: | 1 piece |
Price: | Negotiable |
Standard Packaging: | PVC bag, wooden case,carton |
Delivery Period: | 5-20days |
Payment Method: | TT,LC |
Supply Capacity: | 1000000 |
Precision progressive die for copper stamping smd led lead frame ,abnormal shape thin lead
frame
Lead frames are the metal structures inside a chip package that carry signals from the die to the outside.
Leadframe for a QFP package
The die inside the package is typically glued to the lead frame, and then bond wires attach the die pads to the leads. In the last stage of the manufacturing process, the lead frame is moulded in a plastic case, and outside of the lead frame is cut-off, separating all leads.
Progressive die for lead frame:
-- Discrete device lead frame dies: TO-92,TO-196,ITO-220,TO-252,TO-247,TO-3P etc.
-- IC lead frame dies:DIP-8L,DIP-16L,DIP-18L,DIP-28L,SOP-8L,SOP-16L,SOP-28L,SSOP-8L,SSOP-18L etc.
-- SMT lead frame dies: SOT-23,SOT-143 etc.
A. Material:0.2mm, 0.25mm, 0.3 mm thick brass, copper or stainless steel
B. Finishing:silver,gold ,palladium,tin ,nickel plated
C. Size: customized
D. Packing method: Polybag, carton box
Stamping Capability
A: The min. pitch: 0.5mm
B: Highest stamping speed: 600SPM/min or more
C: Precision: ±0.003mm
D: Rate of hole diameter and thickness 0.85:1
E: Stamping material thickness:0.05-2.0mm
F: zero or less loss of material use.
Tool&Die Profile
Tool&Die Material | SKD11 DC53 45# steel Cr12mov P20 |
Accuracy | 0.002mm |
Capacity | Tool &die :30 sets/month part :1million /month |
Design software | 3D: Pro-E |
2D: auto CAD | |
Surface Treatment | Powder coating,Hot galvanized,Painting,Polishing,Brushing,Chrome, |
Test Equipment | Hardness tester,Chemical analysis,Digital Measuring Projector, Dynamic Balancing Tester, |
universal testing machine & Coordinate-Detector | |
Thickness | 0.1-2.0mm or other special available |
Lead time | 15-55 days according to products Max: 2 Weeks (On Initial Order) |
Standard | ANSI. API.BS.DIN.JIS.GB.etc |
Equipment | 1) Stamping machine |
2) CNC milling and turning, grinding, honing, lapping, broaching and other secondary machining. | |
3) integral CNC machineries & four machining centers, such as milling, broaching, drilling, | |
turning, planning, grinding machinery and three-axle machining centers. | |
Productions Cover | Sheet metal auto parts, Auto stamping parts,Home Electrics stampingparts, Device stamping parts |
We accept your any request on shipment.By air, by sea,and by Express are acceptable.
By Express | By Air | By Sea | |
West Europe | 3-5 days | 4-6 days | 22-30days |
USA &Canada | 3-4days | 5-6 days | 16-27days |
South Asia | 3-5 days | 3-7 days | 12-20 days |
Japan&South Korea | 2-3 days | 3-4 days | 10-13 days |
Russia | -------- | --------- | 30-40 days |
Packing:
First Step Wrapping by PE film to anti-rust.
Second wooden case without need of fumigation.Or as your required.
To get quick response, please contact us by mail directly
Q: How can I get quotation quickly
A: Please send your inquiry and technical details to Our sales Consultand will contact you in 24hrs on business time.
Q: How can I get technical support from you when we are designing a new product?
A: Please feel free to contact with the same email .There will be an exclusive engineer available for you.
Q: How can I contact you when I have some suggestion about your products or service?
A: Please feel free to contact email or phone.We will follow on your suggestion and try our best to make you satisfied.
|
MOQ: | 1 piece |
Price: | Negotiable |
Standard Packaging: | PVC bag, wooden case,carton |
Delivery Period: | 5-20days |
Payment Method: | TT,LC |
Supply Capacity: | 1000000 |
Precision progressive die for copper stamping smd led lead frame ,abnormal shape thin lead
frame
Lead frames are the metal structures inside a chip package that carry signals from the die to the outside.
Leadframe for a QFP package
The die inside the package is typically glued to the lead frame, and then bond wires attach the die pads to the leads. In the last stage of the manufacturing process, the lead frame is moulded in a plastic case, and outside of the lead frame is cut-off, separating all leads.
Progressive die for lead frame:
-- Discrete device lead frame dies: TO-92,TO-196,ITO-220,TO-252,TO-247,TO-3P etc.
-- IC lead frame dies:DIP-8L,DIP-16L,DIP-18L,DIP-28L,SOP-8L,SOP-16L,SOP-28L,SSOP-8L,SSOP-18L etc.
-- SMT lead frame dies: SOT-23,SOT-143 etc.
A. Material:0.2mm, 0.25mm, 0.3 mm thick brass, copper or stainless steel
B. Finishing:silver,gold ,palladium,tin ,nickel plated
C. Size: customized
D. Packing method: Polybag, carton box
Stamping Capability
A: The min. pitch: 0.5mm
B: Highest stamping speed: 600SPM/min or more
C: Precision: ±0.003mm
D: Rate of hole diameter and thickness 0.85:1
E: Stamping material thickness:0.05-2.0mm
F: zero or less loss of material use.
Tool&Die Profile
Tool&Die Material | SKD11 DC53 45# steel Cr12mov P20 |
Accuracy | 0.002mm |
Capacity | Tool &die :30 sets/month part :1million /month |
Design software | 3D: Pro-E |
2D: auto CAD | |
Surface Treatment | Powder coating,Hot galvanized,Painting,Polishing,Brushing,Chrome, |
Test Equipment | Hardness tester,Chemical analysis,Digital Measuring Projector, Dynamic Balancing Tester, |
universal testing machine & Coordinate-Detector | |
Thickness | 0.1-2.0mm or other special available |
Lead time | 15-55 days according to products Max: 2 Weeks (On Initial Order) |
Standard | ANSI. API.BS.DIN.JIS.GB.etc |
Equipment | 1) Stamping machine |
2) CNC milling and turning, grinding, honing, lapping, broaching and other secondary machining. | |
3) integral CNC machineries & four machining centers, such as milling, broaching, drilling, | |
turning, planning, grinding machinery and three-axle machining centers. | |
Productions Cover | Sheet metal auto parts, Auto stamping parts,Home Electrics stampingparts, Device stamping parts |
We accept your any request on shipment.By air, by sea,and by Express are acceptable.
By Express | By Air | By Sea | |
West Europe | 3-5 days | 4-6 days | 22-30days |
USA &Canada | 3-4days | 5-6 days | 16-27days |
South Asia | 3-5 days | 3-7 days | 12-20 days |
Japan&South Korea | 2-3 days | 3-4 days | 10-13 days |
Russia | -------- | --------- | 30-40 days |
Packing:
First Step Wrapping by PE film to anti-rust.
Second wooden case without need of fumigation.Or as your required.
To get quick response, please contact us by mail directly
Q: How can I get quotation quickly
A: Please send your inquiry and technical details to Our sales Consultand will contact you in 24hrs on business time.
Q: How can I get technical support from you when we are designing a new product?
A: Please feel free to contact with the same email .There will be an exclusive engineer available for you.
Q: How can I contact you when I have some suggestion about your products or service?
A: Please feel free to contact email or phone.We will follow on your suggestion and try our best to make you satisfied.